Work in Progress:
Currently installing 1J electric panel, wire and raceways.
4/21- Smith Hall Renovation Updates
Work in Progress: Currently installing 1J electric panel, wire and raceways.Work in Progress:
Completed first lift pour for elevator #2 (South).
Completed first lift pour for stair tower #3.
Grade beams and pile caps along column line 17 are complete.
Steel clips for sequence 1-4 are complete.
Steel erection for sequence 1-4 is in progress.鈥
4/21- ISB/Williams Hall Construction Updates
Work in Progress: Completed first lift pour for elevator #2 (South). Completed first lift pour for stair tower #3. Grade beams and pile caps along column line 17 are complete. Steel clips for sequence 1-4 are complete. Steel erection for sequence 1-4 is in progress.鈥Work in Progress:
Continuing the steam and condensation piping in the East Mechanical room.
Heating and snow melt piping is continuing in the West Mechanical room.
Continuing with the chilled water piping in the West mechanical room.
Working on plenum duct at AHU-1 in East鈥
4/21- Cunningham Hall Renovation Updates
Work in Progress: Continuing the steam and condensation piping in the East Mechanical room. Heating and snow melt piping is continuing in the West Mechanical room. Continuing with the chilled water piping in the West mechanical room. Working on plenum duct at AHU-1 in East鈥Two 青年涩导航 researchers from the College of Arts and Sciences have been awarded more than $1 million in federal grants for their research projects.
The National Institutes of Health鈥檚 National Institute on Aging awarded Gemma Casadesus-Smith, Ph.D., from Kent鈥
青年涩导航 Researchers Receive More Than $1 Million in Grants to Fight Alzheimer鈥檚 and Study Climate Change
Two 青年涩导航 researchers from the College of Arts and Sciences have been awarded more than $1 million in federal grants for their research projects. The National Institutes of Health鈥檚 National Institute on Aging awarded Gemma Casadesus-Smith, Ph.D., from Kent鈥青年涩导航, in partnership with the University of Akron, will present a 鈥淲hy Polling Still Matters鈥 forum at 5:30 p.m. on Monday, April 25, in the Kent Student Center Ballroom Balcony as part of the 鈥淧olitically Speaking鈥 public forum series discussing the upcoming鈥
青年涩导航 to Hold Forum on Why Polling Still Matters
青年涩导航, in partnership with the University of Akron, will present a 鈥淲hy Polling Still Matters鈥 forum at 5:30 p.m. on Monday, April 25, in the Kent Student Center Ballroom Balcony as part of the 鈥淧olitically Speaking鈥 public forum series discussing the upcoming鈥青年涩导航鈥檚 Ohio Employee Ownership Center (OEOC) will host the 30th Annual Ohio Employee Ownership Conference on Friday, April 29, at the Hilton West in Fairlawn, Ohio. The theme for the conference is 鈥淐elebrating Three Decades of Success: Growing the Employee鈥
青年涩导航鈥檚 Ohio Employee Ownership Center Hosts 30th Annual Ohio Employee Ownership Conference
青年涩导航鈥檚 Ohio Employee Ownership Center (OEOC) will host the 30th Annual Ohio Employee Ownership Conference on Friday, April 29, at the Hilton West in Fairlawn, Ohio. The theme for the conference is 鈥淐elebrating Three Decades of Success: Growing the Employee鈥Work in Progress:
Start forming elevator #2 (south).
Grade beam and pile caps along column line #17 between A and G is in progress.
Pile caps for elevator #2 are complete.
Installing pile caps for Stair #3.
Looking forward:
Steel erection sequence #1 will begin on鈥
4/14- ISB Construction Updates
Work in Progress: Start forming elevator #2 (south). Grade beam and pile caps along column line #17 between A and G is in progress. Pile caps for elevator #2 are complete. Installing pile caps for Stair #3. Looking forward: Steel erection sequence #1 will begin on鈥青年涩导航 will host the annual international conference of the Institute for Complex Adaptive Matter on May 16-18 at the 青年涩导航 Hotel and Conference Center.
KENT STATE TO HOST ICAM/I2CAM CONFERENCE MAY 16-18
青年涩导航 will host the annual international conference of the Institute for Complex Adaptive Matter on May 16-18 at the 青年涩导航 Hotel and Conference Center.Work in Progress:
Pulling wire throughout for branch circuits.
Installing duct on 1st floor.
Complete domestic water rough-in on the 2nd floor.
Sanitary piping rough-in has been completed on the 3rd floor.
Completing remaining framing throughout.
Starting door frame鈥
4/7- Smith Hall Renovation Updates
Work in Progress: Pulling wire throughout for branch circuits. Installing duct on 1st floor. Complete domestic water rough-in on the 2nd floor. Sanitary piping rough-in has been completed on the 3rd floor. Completing remaining framing throughout. Starting door frame鈥Work in Progress:
Forming lift 3 on elevator #1.
Working on retaining wall progressing south to column line A7.
Pile caps and foundations for elevator #2 are complete.
Looking forward:
Pour lift #3 on elevator #1 on 4/8/2016.
Steel delivery and erection begins for鈥